Par Don M
5 juin 2018
I requested a new line from the Street to the meter. I also asked for a sixty amp pony panel to be added to my exiting hundred amp panel. They did a good job putting the line to the meter (added a new meter box without asking me first) They installed a new hundred amp panel. Which I did not need. They did not add the sixty amp pony panel I asked for.
>
Signaler
Vous êtes le proprio? Répondez ou Contactez PJ